Figure 29. Troops placing decking from pier 16 to the north abutment. This was the only span which used six 24-inch girders. Note angle-iron diaphraming between girders. Visible at center is two-inch by six-inch laminated sub-decking and beyond that is three-inch by twelve-ince diagonal decking.